[Case Study] Bucket Elevator Chain Replacement Project
We will introduce a case where the chain was replaced due to the progression of wear on the roller, with some areas showing cracks.
We would like to introduce a case of "bucket elevator chain renewal work" carried out at a ready-mixed concrete factory in the Kanto region. The chain of the bucket elevator had deteriorated, and there was significant wear on the rollers, with some areas even showing cracks, prompting the need for replacement. We replaced the chain and reused the existing buckets. To prevent the buckets from detaching, we welded all the bolts and nuts. Although we faced challenges in preventing debris during the work, we were able to proceed smoothly with the construction due to thorough preparation. 【Case Summary】 ■ Reasons for Construction - Deterioration of the bucket elevator chain - Significant wear on the rollers, with some areas showing cracks ■ Actions Taken - Replaced the chain and reused the existing buckets - Welded all bolts and nuts to prevent the buckets from detaching *For more details, please download the PDF or feel free to contact us.
- Company:SHOWA KOKI CO.,LTD
- Price:Other